We do about one kitchen a year (for 22 years). These usually have new floors, cabinets, lights, and run from $10,000 on up (in some the cabinets alone cost $30,000). Kitchens often call for wall removal, and lots of drywall work. Removing bulkheads to be able to install taller cabinets is always popular.
We do about twenty bathroom remodels a year in the northern Virginia area. These range from the vinyl floors and tub/shower units, to the most expensive granite showers and floors.
We used to do about one major hot tub bathroom a year, back when they were more popular.This usually involves removing walls, re-routing plumbing and electrical wires, as well as massive drywall work and the regular shower install, etc.
Showing posts with label tile repair. Show all posts
Showing posts with label tile repair. Show all posts
Saturday, February 6, 2010
Subscribe to:
Posts (Atom)